 |

SR 125 is Now Open
High Tech High-Chula Vista classes begin this fall!
|

 |
 |

Ah, the busy excitement, the heightened
anticipation.

There’s nothing like constant activity to signal the ongoing growth of a unique, new community. We are pleased to report neighborhood and community construction at Windingwalk has progressed beautifully, and there’s lots more on the way.
Community News:
The brand-new Otay Ranch Town Center, which will include over 100 new retail and specialty stores and restaurants, a movie theater and more, is located just across the street from Windingwalk, running the length of the community’s western edge. It’s a true shopper’s delight, perfect for an hours-long extravaganza or a quick ten-minute pickup. Most of the stores and restaurants are already open, and more are coming in this spring and summer.
The south portion of state Route 125, a toll road with on and off ramps at Olympic Parkway near Windingwalk, has been named the South Bay Expressway. Currently under construction and scheduled to open soon, the nearly 10-mile road extends from state Route 54 in Spring Valley to state Route 905 in Otay Mesa.
Construction also began this summer on Windingwalk’s own ten-acre neighborhood retail center, the Marketplace. Vons, Wells Fargo Bank and Happy Nails salon have confirmed sites at the Marketplace, and plans are moving forward for other everyday neighborhood conveniences such as a business service center, drycleaners, and eateries on the first level, plus 43 work-loft spaces above. The Marketplace is scheduled to open in Spring 2008.
Construction began this summer on a second facility, WindingOaks Recreation Center. Occupying three acres, planned features include a resort-style pool, Olympic-style pool, spa, showers, locker rooms, restroom facilities, grassy play areas, conference and event spaces, including an open courtyard area with covered gazebo, and a proposed exercise room and patio. The Irving Gill-style structure features dramatic entry towers, archways and covered walkways. WindingOaks Recreation Center is scheduled to open in early spring 2008.
Directly to the south of Windingwalk, construction is scheduled to begin early next year on High Tech High, a new charter high school planned to consist of approximately 16 acres with a two story facility serving up to 500 students. Approximately 150 9th grade students will begin classes this fall at the school’s temporary site at Mater Dei High school. High Tech High will transition to its new campus once construction is completed, currently scheduled for fall 2008.
Windingwalk Neighborhood News:
Windingwalk’s neighborhoods are filling up fast - while some have already sold out, there are still a few with some remaining homes for sale, and plenty of new construction in the works.
Amber by Shea Homes
2,342 - 2,678 sq.ft.
4 bedrooms, 3 baths
619.216.1869
Agave by Shea Homes
1,464-1,581 sq. ft.
2-3 beds, 2 1/2 - 3 1/2 baths
619.397.7698
Sapphire by Shea Homes
2,606 - 3,046 sq.ft.
4 bedrooms
3 baths
619.216.4531
Trellis by Brookfield Homes
2,361 to 2,620 sq. ft.
4-5 beds, 2 1/2-3 baths
619-934-6138
Cordova by Brookfield Homes
1,638 to 2,024 sq. ft.
3 to 4 beds, 2 1/2 -3 baths
619-781-8400
Clover by Shea Homes
1,579-1,891 sq. ft.
2-4 beds, 2-3 baths
619-397-0964
Please check back often for all the latest developments at Windingwalk.
|
 |